?W?=?q?V


Work is done when moving a point charge away from another charge
The potentials at points?R?and?S?due to the +7.0 nC charge are 675 V and 850 V respectively.
Calculate how much work is done when a +3.0 nC charge is moved from?R?to?S.
Step 1: Write down the known quantities
Step 2: Write down the work done equation
W?=?qΔV
Step 3: Substitute in the values into the equation
W = (3.0 × 10-9) × (850 - 675) = 5.3 × 10-7?J
Remember that?q?in the work done equation is the charge that is being moved, whilst?Q?is the charge which is producing the potential. Make sure not to get these two mixed up, as both could be given in the question (like the worked example) and you will be expected to choose the correct one


Equipotential lines around a radial field or uniform field are perpendicular to the electric field lines
轉(zhuǎn)載自savemyexams
以上就是關(guān)于【AQA A Level Physics復習筆記7.5.3 Work Done on a Charge】的解答,如需了解學校/賽事/課程動態(tài),可至翰林教育官網(wǎng)獲取更多信息。
往期文章閱讀推薦:
全網(wǎng)破防!ALevel CIE數(shù)學M1疑似錯題?經(jīng)濟P2難度飆升?5月6日大考考情分析必看!
A-Level CIE就大規(guī)模泄題發(fā)布最嚴處罰!哪些考生必須重考?你的成績怎么辦?

? 2026. All Rights Reserved. 滬ICP備2023009024號-1